Sustainable, long-term environmental solutions

Long-term environmental permits for your business, operations that run safely and in compliance with the law, and transparent progress on every application.

At a glance

Long-term, sustainable environmental solutions

Sustainable Environmental Solutions is a business and/or activity run under the legal entity PT Cipta Harumi Kotsara, focused on providing long-term, sustainable solutions to environmental problems. Our experienced team is ready to improve the quality of your business's environmental studies, minimizing negative impacts while maximizing positive ones.

Clear flowing water in an environmental baseline study
Personnel in OHS gear inspecting a client facility
34

Environmental document and technical approval projects

2021–2026

Consecutive track record

7

Industrial sector groups served

4

Levels of authority, from regency to ministry

View track record
How we work

A measured workflow at every stage

  1. 01
    Identification

    Understanding your activities and permit status

    An initial assessment to determine which documents are actually required for the scale and location of your activities.

  2. An officer taking a water sample from the edge of a pond02
    Preparation

    Data collection and technical studies

    Baseline environmental sampling, calculation of discharged waste volumes, and preparation of documents in the agency's required format.

  3. 03
    Support

    Support until the approval is issued

    We support you through technical discussions, assessment hearings, and document revisions until the decree is issued.

  4. 04
    Verification

    Facility verification and monitoring

    Support for field verification for the SLO, followed by periodic reporting to keep your compliance status in good standing.

Comparison

Two ways to handle environmental obligations

A single business and/or activity may be required to hold several documents at once, from Environmental Approval to periodic reports. Here is the difference at each stage when documents are handled separately and when one team supports you from the start.

  1. 01Initial assessment

    Handled separatelyDocument type is determined late, often incorrectly

    Supported by SESDocument requirements are checked at the outset, before costs are incurred

  2. 02Environmental Approval

    Handled separatelyBusiness licensing is held up because the Environmental Approval has not been issued

    Supported by SESEnvironmental Approval is supported until the decree is issued

  3. 03Technical studies

    Handled separatelyTechnical studies are prepared without reference to the facility design

    Supported by SESTechnical studies are prepared to match actual facility conditions on site

  4. 04Field verification

    Handled separatelyThe facility is already built but fails field verification

    Supported by SESThe facility is checked against the Technical Approval before field verification

  5. 05Periodic reporting

    Handled separatelySemi-annual reports are late or not submitted to SIMPEL (the online environmental reporting system)

    Supported by SESEnvironmental Approval implementation reports are prepared and submitted on time

  6. 06Inspection

    Handled separatelyCompliance gaps only come to light when inspectors arrive

    Supported by SESCompliance gaps are mapped through periodic audits

  7. 07Coordination

    Handled separatelyEach document is handled by a different party without coordination

    Supported by SESOne point of responsibility from documents to the Operational Feasibility Certificate and reporting

Compliance roadmap

Regulatory & Compliance Roadmap

The permitting sequence, from spatial use conformity to the Operational Feasibility Certificate.

  1. Stage 1

    Spatial conformity

    Spatial use conformity approval.

    KKPR
  2. Stage 2

    Technical standards

    Wastewater, emissions, B3 waste, and traffic impact analysis.

    Technical Approval
  3. Stage 3

    Environmental feasibility

    AMDAL, UKL-UPL, Detailed RKL-RPL, DELH, or DPLH.

    Environmental Approval
  4. Stage 4

    Buildings

    Building approval.

    PBG
  5. Stage 5

    Operational feasibility

    Wastewater, emissions, B3 waste, and traffic impact analysis.

    SLO
View full roadmap
An officer in a hard hat and safety vest inspecting an industrial facility
Strengths

Why choose us

Long-term

Long-term, sustainable permits

Our services ensure your business's environmental permits remain valid for the long term, so you do not have to go through the trouble of obtaining environmental permits again and again.

Legally compliant

Safe and compliant operations

We ensure your business operations run safely and in compliance with the law, for long-term business sustainability.

Waste value

Financial impact from waste management

Our services optimize your business's waste management so that it is put to good use and delivers financial impact, both direct and indirect.

Transparent

Certainty of processing time

Transparent progress tracking gives you certainty on when you can start legally compliant business operations.

Experienced team

Experienced team

Our experienced team is ready to improve the quality of your business's environmental studies, minimizing negative impacts while maximizing positive ones.

Our philosophy

Biotic, abiotic, and biosphere read as one system

The impact of an activity never stands alone. Water quality affects flora and fauna, emissions affect the air and workers' health, and both ultimately bear on the environment's capacity to support business activities. Our studies examine all three together, not one at a time.

Learn about our approach
A clear river flowing among rocks and mountain forest
FAQ

Most frequently asked questions

The answers below are general. Actual obligations depend on the scale, location, and type of activity, so they should be confirmed through an initial assessment.

This is determined through an initial assessment that looks at the type of activity, its scale, and its location. Activities with significant impacts and large scale require an AMDAL (environmental impact assessment), activities with non-significant impacts require a UKL-UPL (environmental management and monitoring efforts), and small-scale activities only need an SPPL (environmental management and monitoring commitment statement). Location also matters, because activities inside or bordering protected areas are treated differently even at the same scale.

As a reference: AMDAL 6–12 months, UKL-UPL 3–6 months, and SPPL 1–2 days. The actual time depends on the completeness of the data and the assessing agency's hearing schedule, since an AMDAL goes through public consultation and several assessment stages. We provide a more definite schedule after reviewing the details of your activities.

PERTEK (Technical Approval) is a technical approval of discharge or utilization standards, for example wastewater into water bodies, stack emissions, or B3 (hazardous and toxic) waste management. RINTEK (Technical Details for B3 Waste Storage) covers the storage of B3 waste, including the TPS (temporary storage facility) building, packaging, symbols, and labels. They are different documents with different processes.

Yes. The route is a DELH (environmental evaluation document) for activities that should have required an AMDAL, and a DPLH (environmental management document) for those that should have required a UKL-UPL. These documents are used to resolve administrative sanctions and restore the legal standing of activities that are already operating.

No. The SLO is issued after field verification confirms that the facility has been built and functions in accordance with the PERTEK. The sequence is: PERTEK first, then the facility is built according to that PERTEK, then trial operation, and only then verification for the SLO.

At the frequency stipulated in the environmental feasibility decree. If none is stipulated, reports are submitted once every 6 months. Reports are submitted through the SIMPEL system. This obligation applies for as long as the Environmental Approval remains active, including periods when the activity is not in full production.

Yes. We provide support for matters at both the central government and regional agency levels, and projects can be handled anywhere in Indonesia. Site visits are arranged according to the activity's location.

Ready to secure your business's compliance and sustainability?

Tell us your type of activity and current permit status. We will help map out the required documents, estimated processing time, and cost.